ANGED

Ste Entreprise Travaux Publics & Terrassement

Projet

Controlled landfill

Extension work of the 5th bin of the Djbel Chakir landfill (Tunis)
  • Layout of the surfaces of the landfill
  • Excavation of polluted soil
  • Excavation of the dump bin (loose material)
  • Embankment execution
  • Embankment selected in All coming 0/40 for dike and locker
  • All-in foundation layer 0 / 31.5 for access road
  • Implementation Trapezoidal concrete pit (0.50 x 0.50)
  • Reinforced concrete nozzle (diameter 600)
  • Reinforced concrete head for nozzle (diameter 600)
  • Implementation of the geomembrane in HDPE 2.5mm
  • Implementation of 400g / m² geotextile
  • Sand bed
  • Draining layer in gravel 25/40
  • Drainage and drainage of water and leachates
    • Collection and drainage networks for leachates
    • HDPE-DN 40 pipes
    Extension work of the 5th bin of the Djbel Chakir landfill (Tunis)
    • Layout of the surfaces of the landfill
    • Excavation of polluted soil
    • Excavation of the dump bin (loose material)
    • Embankment execution
    • Embankment selected in All coming 0/40 for dike and locker
    • All-in foundation layer 0 / 31.5 for access road
    • Implementation Trapezoidal concrete pit (0.50 x 0.50)
    • Reinforced concrete nozzle (diameter 600)
    • Reinforced concrete head for nozzle (diameter 600)
    • Implementation of the geomembrane in HDPE 2.5mm
    • Implementation of 400g / m² geotextile
    • Sand bed
    • Draining layer in gravel 25/40
    • Drainage and drainage of water and leachates
      • Collection and drainage networks for leachates
      • HDPE-DN 40 pipes
    • Implementation of perforated pipes in HDPE-DN 315PN20
    • Implementation of pipes HDPE-DN 315PN20
    • Civil Engineering of the leachate pumping station
    • Equipment of the leachate pumping station
    Works to build the second Sfax controlled landfill
    • Arrangement of the surfaces of the locker
    • Sealing of the base of the rack and the leachate basin
    • Drainage and drainage of water and leachates
    • Infrastructure
    • Lighting and equipment of the leachate pumping station
    Extension works for the second tranche of the 6th bin of the Djbel Chakir landfill (Greater Tunis)
    • Layout of the surfaces of the landfill
      • Excavation of polluted soil, dredging of leachate basins
      • Excavation of the dump bin (loose material)
      • Embankment execution
      • Anti-contaminating layer
      • All-in foundation layer 0 / 31.5 for access path
      • Base layer in all coming 0/20 for access path
      • Impregnation layer
      • Superficial bilayer coating
      • Trapezoidal concrete ditch
    • Drainage of rainwater
      • Single slab (1.00×1.00) cast on site or prefabricated
      • Head for Dalot Single (1.00×1.00)
    • Submersible passage
      • Wall made of reinforced concrete for black currant
      • Reinforced concrete raft
      • Supply and installation of guide pin
      • Manufacture and implementation of gabion protective works
    • Sealing of the base of the rack and the leachate basin
      • Supply and implementation of the 2.5mm HDPE geomembrane
      • Supply and implementation of 400g / m² geotextile
      • Sand bed
      • Draining layer in gravel 25/40
      • Clay layer from cuttings
    • Drainage and evacuation of leachates
      • Collection and drainage networks for leachates
      • Perforated pipes in HDPE-DN 250
      • HDPE-DN 315 pipes
      • Perforated pipes in HDPE-DN 315
      • Construction of leachate collection manholes 1000mm diameter
    • Pumping station
      • Civil Engineering of the leachate pumping station
      • Equipment of the leachate pumping station
    Extension of the Bizerte landfill (Civil works)
    • Arrangement of the surfaces of the locker
      • Topsoil stripping (20 cm)
      • Excavation of all types of land from the landfill area and storage in the excess excavation storage area
      • Embankment of the peripheral dike of the bin from the excavated material
    • Sealing of the base of the rack and the leachate basin
      • Supply and implementation of clay for the realization of the mineral waterproofing barrier for leachate and basin leachate
      • Implementation of the PE-HD Geomembrane for the bottom and slope of the bin and the leachate basin
      • Implementation of PP nonwoven protective geotextile 400 g / m²
      • Sand bed
    • Drainage and drainage of water and leachates
      • Gravel for draining layer
      • Supply and Implementation of Perforated Pipe PE-100-DN 250, PN16
      • Supply and installation of full pipe PE-100-DN 250, PN16
      • Supply and installation of full pipe PE-100-DN 315, PN16
      • Supply and implementation of PE-HD bushing DN 315
      • Supply and installation of DN 2000 reinforced concrete eyes
      • Supply and Implementation of a rainwater drainage gutter
    • Leachate pumping station
      • Civil Engineering of the leachate pumping station
      • Equipment of the leachate pumping station
    • Traffic circulation
      • Traffic circulation
      • Access ramp
    Extension of the Bizerte landfill (Acquisition of geomembranes and geotextiles)
    • Sealing of the base of the rack and the leachate basin
      • Delivery of PE-HD Geomembrane for the bottom and the slope of the bin and the leachate basin
      • Delivery of PP nonwoven protective geotextile 400 g / m²
    Extension works of the controlled landfill of household and assimilated garbage of the Greater Tunis of Jebel Chekir
    • Agreements and distributions
    • Development of the surfaces of the rack and the leachate basin
    • Sealing of the base of the rack and the leachate basin
    • Drainage and drainage of water and leachates
    • Infrastructure
    • Pumping stations