Four Seasons Hotel

Ste Entreprise Travaux Publics & Terrassement

Projet

Four Seasons Hotel

  • General earthworks 120 000m³
  • Lot VRD (Hors Voiries)
  • Site installation
  • Execution study and recollection plans
  • Clearing and stripping topsoil
  • Excavation of any kind put in embankment or in deposit
  • Loan materials set backfill
  • Performing embankments
  • Pipelines for networks
  • Regards & connection boxes
  • Laying of culverts in BA [1,5 x 1]
  • U-Channel Layout in BA [1.5 x 1]
  • Grease tray [5 x 1.5 x 2]
  • Head structure in BA